---
title: "Artemis and the Moon: where NASA's program stands at the end of 2026"
description: "Artemis II succeeded in April 2026, Artemis III became a 2027 Earth-orbit test and a Moon landing is targeted for 2028: where things stand on November 17."
url: "https://weekinfo.site/info/artemis-moon-program-status-2026"
lang: "en"
author: "La rédaction"
published: "2026-11-17"
updated: "2026-11-17"
---

# Artemis and the Moon: where NASA's program stands at the end of 2026

> **Key takeaways** — Artemis II flew four astronauts around the Moon in April 2026, farther from Earth than any humans before. Artemis III, planned for 2027, will not land: it is now a 14-day crewed test flight in Earth orbit. The first landing is targeted for 2028 with Artemis IV.

As of November 17, 2026, NASA's Artemis program has cleared one major milestone and is preparing the next. **Artemis II** carried four astronauts around the Moon from April 1 to April 10, 2026. **Artemis III**, expected in 2027, has changed shape: no landing, but a crewed test flight in Earth orbit. A return to the lunar surface is now targeted for 2028, with Artemis IV.

## What did Artemis II achieve?

The mission launched on April 1, 2026 from Kennedy Space Center in Florida, with the Orion spacecraft atop the SLS rocket. The crew was NASA's Reid Wiseman, Victor Glover and Christina Koch, plus Jeremy Hansen of the Canadian Space Agency. It was the first crewed lunar flyby in 50 years.

According to NASA, the crew reached **252,756 miles** from Earth at their farthest point, breaking the record set by Apollo 13 in 1970. Orion splashed down in the Pacific off San Diego at 5:07 p.m. PDT on April 10, after 9 days, 1 hour and 32 minutes in flight and 695,081 miles traveled.

“Reid, Victor, Christina, and Jeremy, welcome home, and congratulations on a truly historic achievement,” NASA Administrator Jared Isaacman said. On October 7, NASA released the mission's full lunar science dataset, more than 800 gigabytes.

## Why won't Artemis III land on the Moon?

NASA redesigned the mission to reduce risk before a landing. Artemis III will be a test flight of Orion with four astronauts, planned for **14 days in Earth orbit**. It will rehearse rendezvous and docking with test versions of both commercial lunar landers, from SpaceX and Blue Origin.

1. Blue Origin launches a Blue Moon lander test article into Earth orbit.
2. SLS launches Orion and its crew.
3. Orion docks with the Blue Moon test article.
4. SpaceX launches a Version 3 Starship lander test article.
5. Orion undocks from Blue Moon and docks with Starship.

The crew was unveiled on June 9, 2026: commander Randy Bresnik, Frank Rubio and Andre Douglas of NASA, and Luca Parmitano of the European Space Agency. “We are certainly humbled as a crew,” Bresnik said, according to the Associated Press.

## How far along are preparations?

At Kennedy, assembly is moving. NASA finished stacking the solid rocket boosters (announced October 13), then integrated the SLS core stage between them on October 25 inside the Vehicle Assembly Building. Because the mission stays in Earth orbit, the rocket is in a “short stack” configuration with no upper stage.

The next announced step is a rollout to Launch Pad 39B for a **tanking test**, loading liquid hydrogen and liquid oxygen into the core stage and rehearsing the countdown. No date has been confirmed for that test. On October 23, NASA leaders kept a summer 2027 target for Artemis III. “We're seeing our processing times cut in half in some cases,” said Artemis program manager Jeremy Parsons. Isaacman added: “We will simply not accept that great achievements simply require more time and more money.”

**The Artemis timeline as of November 17, 2026**

| Mission | Date | Goal | Status |
| --- | --- | --- | --- |
| Artemis II | April 1–10, 2026 | Crewed lunar flyby | Successful |
| Artemis III | 2027 (summer target) | 14-day crewed test in Earth orbit, docking with landers | In preparation |
| Artemis IV | 2028 (target) | Program's first crewed landing | Planned |

## When will astronauts walk on the Moon again?

NASA is aiming for 2028 with Artemis IV. Astronauts will launch on Orion atop SLS; SpaceX's Starship, refueled in Earth orbit, will meet Orion, while Blue Origin plans to push its Blue Moon Mark 2 lander toward lunar orbit. NASA and Axiom Space are developing a lighter “Sortie suit,” roughly half the weight of the larger suit, for the first moonwalks. The program then targets the lunar South Pole and an enduring human presence.

> **Still to be confirmed** — The exact Artemis III launch date, the date of the tanking test at Pad 39B and whether the 2028 landing holds are not confirmed as of today. The program has already seen years of delays and billions in added costs.

For more science news this season, see [our pick of autumn 2026 discoveries](https://weekinfo.site/info/science-discoveries-fall-2026), and for the wider US picture, [our main US story of the week](https://weekinfo.site/info/midterms-2026-democratic-congress-trump).

## Frequently asked questions

### Did Artemis II land on the Moon?

No. It was a flyby: Orion looped around the Moon and returned to Earth, splashing down in the Pacific on April 10, 2026.

### Why test in Earth orbit before landing?

To rehearse, with a crew aboard, Orion's rendezvous and docking with the SpaceX and Blue Origin landers before relying on them near the Moon.

### Who is on the Artemis III crew?

Randy Bresnik (commander), Frank Rubio and Andre Douglas of NASA, and ESA astronaut Luca Parmitano, named on June 9, 2026.

### Is the 2028 landing date firm?

No. It is NASA's stated goal; neither lander is ready yet and the schedule could slip.

## Sources

- [NASA – Artemis II: NASA's first crewed lunar flyby in 50 years](https://www.nasa.gov/mission/artemis-ii/) (November 17, 2026)
- [NASA – NASA Welcomes Record-Setting Artemis II Moonfarers Back to Earth](https://www.nasa.gov/news-release/nasa-welcomes-record-setting-artemis-ii-moonfarers-back-to-earth/) (May 7, 2026)
- [NASA – NASA Shares Plans to Accelerate Artemis, Return to Moon](https://www.nasa.gov/missions/artemis/nasa-shares-plans-to-accelerate-artemis-return-to-moon/) (November 4, 2026)
- [NASA – Artemis III SLS Core Stage Joins Boosters at Kennedy](https://www.nasa.gov/image-article/artemis-iii-sls-core-stage-joins-boosters-at-kennedy/) (October 28, 2026)
- [NASA – Artemis blog (Artemis III booster stacking, Artemis II science data)](https://www.nasa.gov/blogs/artemis/) (November 17, 2026)
- [AP via WTOP – NASA unveils Artemis III astronauts to test technology for a future moon landing](https://wtop.com/national/2026/06/nasa-unveils-artemis-iii-astronauts-to-test-technology-for-a-future-moon-landing/) (June 9, 2026)
- [WKMG ClickOrlando – Artemis III on schedule for summer 2027 launch](https://www.clickorlando.com/news/local/2026/10/23/artemis-iii-on-schedule-for-summer-2027-launch/) (October 23, 2026)

— La rédaction · November 17, 2026
